Key facts
- Work it coversExcavation and trenching
- WhenBefore workers enter an excavation or trench and whenever site, soil, water, weather, support-system, or adjacent-structure conditions change.
- RuleO. Reg. 213/91, Part III Excavations, ss. 222-242, including entry restrictions, soil classification, protective systems, adjacent-structure protection, water control, barriers, and support systems.
- Who signsCompetent person / supervisor acknowledgement recommended for each inspection entry.
- Keep itRetain trench and excavation inspection records with the project safety file according to constructor, employer, and contract recordkeeping requirements.
When must the log be completed?
- Required Timing: Before workers enter an excavation or trench and whenever site, soil, water, weather, support-system, or adjacent-structure conditions change.
- Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
- Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.
How do you complete the log?
- Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
- Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
- Sign the Entry: Competent person / supervisor acknowledgement recommended for each inspection entry.
- Store the Record: Retain trench and excavation inspection records with the project safety file according to constructor, employer, and contract recordkeeping requirements.