Ontario construction safety logs

Ontario construction safety logs: what to record and when

Ontario’s construction regulation, O. Reg. 213/91, and related rules require many site checks to be done, and some to be written down, before or during the work. This section covers 20 common logs, from ladders, scaffolds and lifts to hot work, confined space entry and lockout. Each page says when the check is needed, who signs it, how long to keep it and which regulation applies.

Published by Blue Crane Works. Last reviewed . Each rule was checked against Ontario's e-Laws by the publisher; longer sections were drafted with AI assistance.

01

Hot Work Permit Log

Before each welding, cutting, blow-torch, or similar ignition-source task where the constructor or employer uses a hot-work permit control.

02

Elevating Work Platform Daily Inspection Log

Daily before use, in accordance with the manufacturer's instructions, for every elevating work platform used on the project.

03

Excavation and Trench Inspection Log

Before workers enter an excavation or trench and whenever site, soil, water, weather, support-system, or adjacent-structure conditions change.

04

Weekly Site Inspection and Safety Talk Log

At least weekly for the supervisor inspection required by section 14(4). Toolbox talks may be documented on the same cadence when used to communicate inspection findings, hazards, and controls.

05

Ladder Inspection Log

Before first use on each shift and whenever the ladder is moved, damaged, or exposed to a new hazard.

06

Scaffold Inspection Checklist

Before use after erection, alteration, adverse weather, impact, or any condition change.

07

Confined Space Entry Log

Before every confined-space entry and whenever atmospheric, rescue, isolation, or work-scope conditions change.

08

Forklift Pre-Use Inspection Log

Before each shift or first use by the assigned operator.

09

Fall Protection Equipment Inspection Log

Before each use and after any fall arrest event, impact, visible damage, or manufacturer-specified trigger.

10

Traffic Control Plan Checklist

Before lane occupation, traffic staging changes, shift changes, or municipal inspection.

11

Crane, Hoist and Lift Log

Before critical lifts, repeated lift sequences, equipment changes, ground-condition changes, or weather changes.

12

Propane Cylinder Storage Log

Daily when propane is stored or used on site and whenever storage locations change.

13

Silica Dust Control Log

Before dust-generating work starts and whenever cutting, grinding, drilling, ventilation, or wet-control conditions change.

14

Asbestos Abatement Log

Before abatement begins and whenever enclosure, type of operation, worker access, or clearance status changes.

15

Roofing Fall Protection Plan

Before roofing work starts and whenever edge exposure, access, weather, or work area changes.

16

Demolition Pre-Start Checklist

Before demolition begins and when hidden services, structural instability, or adjacent occupancy conditions change.

17

Lockout and Tagout Log

Before service, maintenance, demolition, tie-in, or energization work begins.

18

First Aid Kit Inspection Log

At the start of the project, at least monthly, and after any first aid supply use.

19

Fire Extinguisher Inspection Log

Monthly and before hot-work, fuel-storage, or high-risk ignition work areas are released.

20

Site Orientation and Sign-In Log

Before a worker, visitor, subcontractor, or delivery person enters active construction areas.