Ontario construction safety log

First Aid Kit Inspection Log

A first aid inspection log records the check of each first aid box and station. Ontario's first aid regulation, Reg. 1101 under the Workplace Safety and Insurance Act, requires employers to inspect first aid boxes and their contents at least every three months and to mark each box's inspection card with the date and the inspector's signature (section 6). Many sites check monthly and after any use.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance from the official sources listed below; the answer above was checked against Ontario's e-Laws by the publisher.

Key facts

  • Work it coversFirst aid station and kit inspection
  • WhenAt the start of the project, at least monthly, and after any first aid supply use.
  • RuleWSIB first aid requirements and project safety programme controls
  • Who signsAssigned first aid attendant or supervisor acknowledgement.
  • Keep itRetain with project health and safety administration records.

When must the log be completed?

  • Required Timing: At the start of the project, at least monthly, and after any first aid supply use.
  • Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
  • Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.

How do you complete the log?

  • Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
  • Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
  • Sign the Entry: Assigned first aid attendant or supervisor acknowledgement.
  • Store the Record: Retain with project health and safety administration records.