Ontario construction safety log

Scaffold Inspection Checklist

A scaffold inspection checklist records the check of a scaffold before it is used after erection, alteration, bad weather or impact: base plates, bracing, planking, guardrails, ties and access. Ontario's scaffold rules are in O. Reg. 213/91, and the checklist is the record that a competent person found the scaffold safe and marked it ready or restricted before workers went up.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance from the official sources listed below; the answer above was checked against Ontario's e-Laws by the publisher.

Key facts

  • Work it coversScaffold erection and use
  • WhenBefore use after erection, alteration, adverse weather, impact, or any condition change.
  • RuleO. Reg. 213/91 scaffold and access-platform requirements
  • Who signsCompetent person or supervisor sign-off for scaffold status and access restrictions.
  • Keep itRetain with project scaffold, access, and inspection records.

When must the log be completed?

  • Required Timing: Before use after erection, alteration, adverse weather, impact, or any condition change.
  • Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
  • Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.

How do you complete the log?

  • Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
  • Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
  • Sign the Entry: Competent person or supervisor sign-off for scaffold status and access restrictions.
  • Store the Record: Retain with project scaffold, access, and inspection records.