Ontario construction safety log

Weekly Site Inspection and Safety Talk Log

A weekly site inspection and safety talk record documents the inspection Ontario requires on construction projects: a supervisor or competent person must inspect project machinery and equipment at least once a week, or more often as the supervisor decides (O. Reg. 213/91, section 14(4)). Recording the findings and the toolbox talk that shares them shows the inspection happened and the crew heard about it.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance from the official sources listed below; the answer above was checked against Ontario's e-Laws by the publisher.

Key facts

  • Work it coversGeneral construction supervision
  • WhenAt least weekly for the supervisor inspection required by section 14(4). Toolbox talks may be documented on the same cadence when used to communicate inspection findings, hazards, and controls.
  • RuleO. Reg. 213/91, s. 14(3)-(4). A supervisor or competent person appointed by the supervisor must inspect project machinery, equipment, fire extinguishing equipment, electrical installations, access/egress, and related site systems at least weekly or more frequently as necessary.
  • Who signsSupervisor or competent-person signature for the weekly inspection record, with attendee acknowledgement where the inspection is paired with a toolbox talk.
  • Keep itRetain weekly inspection and toolbox-talk records with the project safety file according to constructor, employer, and contract recordkeeping requirements.

When must the log be completed?

  • Required Timing: At least weekly for the supervisor inspection required by section 14(4). Toolbox talks may be documented on the same cadence when used to communicate inspection findings, hazards, and controls.
  • Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
  • Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.

How do you complete the log?

  • Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
  • Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
  • Sign the Entry: Supervisor or competent-person signature for the weekly inspection record, with attendee acknowledgement where the inspection is paired with a toolbox talk.
  • Store the Record: Retain weekly inspection and toolbox-talk records with the project safety file according to constructor, employer, and contract recordkeeping requirements.

Official sources

Every fact on this page traces back to a primary Government of Ontario source. Verify against the original before relying on it.