What does the Temporary Works Checklist record?
- Each temporary work: type, location and purpose
- Design: the engineer's drawing where one is required
- Erection check against the design
- Inspection before loading and on a schedule
- Changes or damage and re-inspection
- Removal or striking approval
Which Ontario rule applies?
O. Reg. 213/91 (Construction Projects) sets rules for formwork, falsework, scaffolds and excavation support, including when an engineer's design and inspection are required. Under the OHSA the constructor must ensure those measures are carried out on the project (s. 23).
Read the law
Key facts
- Used byFormwork, Shoring & Site Supervisors
- FormatChecklist of 6 items to complete and keep with the project file