Ontario contractor template

Temporary Works Checklist

A temporary works checklist tracks the structures that hold a job together while it is being built: shoring, formwork, falsework, scaffolds, hoarding and bracing. It records the design, who checked it and when, because O. Reg. 213/91 requires some temporary works to be designed by a professional engineer and checked before they are loaded.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Temporary Works Checklist record?

  • Each temporary work: type, location and purpose
  • Design: the engineer's drawing where one is required
  • Erection check against the design
  • Inspection before loading and on a schedule
  • Changes or damage and re-inspection
  • Removal or striking approval

Which Ontario rule applies?

O. Reg. 213/91 (Construction Projects) sets rules for formwork, falsework, scaffolds and excavation support, including when an engineer's design and inspection are required. Under the OHSA the constructor must ensure those measures are carried out on the project (s. 23).

Read the law

Key facts

  • Used byFormwork, Shoring & Site Supervisors
  • FormatChecklist of 6 items to complete and keep with the project file