Key facts
- Work it coversDemolition pre-start controls
- WhenBefore demolition begins and when hidden services, structural instability, or adjacent occupancy conditions change.
- RuleO. Reg. 213/91 demolition and structural hazard controls
- Who signsSupervisor and competent person acknowledgement before release to work.
- Keep itRetain with demolition plan, utility disconnects, and project safety records.
When must the log be completed?
- Required Timing: Before demolition begins and when hidden services, structural instability, or adjacent occupancy conditions change.
- Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
- Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.
How do you complete the log?
- Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
- Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
- Sign the Entry: Supervisor and competent person acknowledgement before release to work.
- Store the Record: Retain with demolition plan, utility disconnects, and project safety records.
Official sources
Every fact on this page traces back to a primary Government of Ontario source. Verify against the original before relying on it.
- Ontario e-Laws: regulation textontario.ca