Ontario contractor template

Hazard Assessment / JHA / JSA Form Template

A hazard assessment, often called a job hazard analysis, breaks a task into steps, names the hazards in each step, and records the safe work method and controls, with sign-off. It is the planning version of the FLHA and usually becomes the written procedure crews follow.

Published by Blue Crane Works. Last reviewed . Field list from the Blue Crane Works form library. Summary drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Hazard Assessment / JHA / JSA record?

Task-by-task hazard and safe-work-method analysis with sign-off.

Hazard Assessment / JHA / JSA: 8 fields, 7 required
FieldRequiredAnswer type
Company NameYesShort answer
Project / Job NameYesShort answer
Task / SequenceYesShort answer
Prepared ByYesShort answer
Assessment DateYesDate
Hazards / Risk FactorsYesNotes
Controls / Safe Work MethodYesNotes
Review / Sign-off NotesNoNotes

Which Ontario rule applies?

The OHSA requires an employer to provide information, instruction and supervision to protect workers (s. 25(2)(a)) and to take every precaution reasonable in the circumstances (s. 25(2)(h)). Some work needs a written assessment by law, such as confined spaces under O. Reg. 632/05 (s. 6).

Read the law

Key facts

  • Used byGeneral Contractors, Site Supervisors & Field Crews
  • Also calledjha, jsa, hazard assessment
  • Format8 fields to fill in, then sign and keep with the project file