Ontario construction safety log

Traffic Control Plan Checklist

A traffic control plan checklist confirms that a work zone on or beside a road is set up to the approved plan before lanes are occupied and at every staging or shift change: signs, devices, tapers, buffers and traffic control persons. The provincial standard is the Ontario Traffic Manual, Book 7 (Temporary Conditions), and municipal road occupancy permits add their own conditions.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance from the official sources listed below; the answer above was checked against Ontario's e-Laws by the publisher.

Key facts

  • Work it coversTraffic control plan implementation
  • WhenBefore lane occupation, traffic staging changes, shift changes, or municipal inspection.
  • RuleOntario Traffic Manual Book 7 and municipal right-of-way permit conditions
  • Who signsTraffic control supervisor and site supervisor acknowledgement.
  • Keep itRetain with road occupancy permit and project safety file.

When must the log be completed?

  • Required Timing: Before lane occupation, traffic staging changes, shift changes, or municipal inspection.
  • Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
  • Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.

How do you complete the log?

  • Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
  • Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
  • Sign the Entry: Traffic control supervisor and site supervisor acknowledgement.
  • Store the Record: Retain with road occupancy permit and project safety file.