Ontario contractor template

Traffic Control Plan & Signage Verification Form Template

A traffic control verification form is the daily check that a work zone's signs, devices and layout match the approved traffic control plan, recorded at set-up and through the shift. It is the evidence that the plan on paper was the plan on the road.

Published by Blue Crane Works. Last reviewed . Field list from the Blue Crane Works form library. Summary drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Traffic Control Plan & Signage Verification record?

Daily traffic layout and signage verification record for site traffic control.

Traffic Control Plan & Signage Verification: 7 fields, 6 required
FieldRequiredAnswer type
Company NameYesShort answer
Project / Traffic Control AreaYesShort answer
Roadway / Work ZoneYesShort answer
Completed ByYesShort answer
Verification DateYesDate
Setup / Signage / DevicesYesNotes
Deviations / ActionsNoNotes

Which Ontario rule applies?

Ontario Traffic Manual Book 7 and municipal right-of-way permit conditions.

Read the law

Key facts

  • Used byGeneral Contractors, Site Supervisors & Field Crews
  • Also calledtraffic verification, flagger plan, traffic control plan verification
  • Format7 fields to fill in, then sign and keep with the project file