Key facts
- Work it coversCrane, hoist, and rigging lifts
- WhenBefore critical lifts, repeated lift sequences, equipment changes, ground-condition changes, or weather changes.
- RuleO. Reg. 213/91 hoisting and rigging controls
- Who signsCrane operator, rigger, signaler, and lift supervisor acknowledgement.
- Keep itRetain with lift plan, rigging inspection, and equipment records.
When must the log be completed?
- Required Timing: Before critical lifts, repeated lift sequences, equipment changes, ground-condition changes, or weather changes.
- Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
- Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.
How do you complete the log?
- Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
- Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
- Sign the Entry: Crane operator, rigger, signaler, and lift supervisor acknowledgement.
- Store the Record: Retain with lift plan, rigging inspection, and equipment records.
Official sources
Every fact on this page traces back to a primary Government of Ontario source. Verify against the original before relying on it.
- Ontario e-Laws: regulation textontario.ca