Ontario construction safety log

Crane, Hoist and Lift Log

A crane, hoist and lift log records lift plans, inspections and conditions for cranes and hoists on a project. Ontario requires the cables on a crane or hoist in use to be visually inspected by a competent worker at least once a week, with the condition recorded and the record kept at the project (O. Reg. 213/91, section 170), and sets the hoisting rules around them.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance from the official sources listed below; the answer above was checked against Ontario's e-Laws by the publisher.

Key facts

  • Work it coversCrane, hoist, and rigging lifts
  • WhenBefore critical lifts, repeated lift sequences, equipment changes, ground-condition changes, or weather changes.
  • RuleO. Reg. 213/91 hoisting and rigging controls
  • Who signsCrane operator, rigger, signaler, and lift supervisor acknowledgement.
  • Keep itRetain with lift plan, rigging inspection, and equipment records.

When must the log be completed?

  • Required Timing: Before critical lifts, repeated lift sequences, equipment changes, ground-condition changes, or weather changes.
  • Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
  • Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.

How do you complete the log?

  • Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
  • Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
  • Sign the Entry: Crane operator, rigger, signaler, and lift supervisor acknowledgement.
  • Store the Record: Retain with lift plan, rigging inspection, and equipment records.