Critical Lift Plan / Permit Form Template

A critical lift plan is the detailed plan for a lift that is heavy, near the crane's capacity, over people or near power lines: crane setup, load, rigging, ground and the assigned roles. Many companies define a critical lift by percentage of crane capacity, so the plan should say which test triggered it.

Published by Blue Crane Works. Last reviewed . Field list from the Blue Crane Works form library. Summary drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Critical Lift Plan / Permit record?

Lift plan for crane setup, load details, rigging, conditions, and assigned roles.

Critical Lift Plan / Permit: 9 fields, 8 required
FieldRequiredAnswer type
Company NameYesShort answer
Project / Lift NameYesShort answer
Lift LocationYesShort answer
Lift DateYesDate
Crane / Lift EquipmentYesShort answer
Lift Lead / SignallerYesShort answer
Load / Rigging DetailsYesNotes
Site / Weather / Exclusion ZoneYesNotes
Communication / Rescue NotesNoNotes

Which Ontario rule applies?

O. Reg. 213/91 hoisting and rigging controls, for lifts the project plans in advance.

Read the law

Key facts

  • Used byGeneral Contractors, Site Supervisors & Field Crews
  • Also calledcritical lift, lift permit, critical lift plan
  • Format9 fields to fill in, then sign and keep with the project file