A crane lift plan records how a lift will be done before the load leaves the ground: the crane and its configuration, the load weight, rigging, radius, ground conditions, and who is in charge. It is the planning record behind the hoisting rules in O. Reg. 213/91 and is standard practice for heavy, complex or critical lifts.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Crane Lift Plan record?

  • Crane make, model, configuration and capacity chart
  • Load weight, centre of gravity and rigging
  • Lift radius, boom length and percentage of capacity
  • Ground bearing, outriggers and mats
  • Powerline clearances and exclusion zone
  • Signal person, operator and lift supervisor
  • Weather limits and stop-work conditions

Which Ontario rule applies?

O. Reg. 213/91 (Construction Projects) sets the rules for cranes, hoisting and rigging on Ontario projects, including the minimum distance any object may come to an energized overhead line (s. 188). Mobile crane and tower crane operator are compulsory trades in Ontario, so operators need the matching certificate of qualification.

Read the law

Key facts

  • Used byCrane, Rigging & Structural Contractors
  • FormatChecklist of 7 items to complete and keep with the project file