Key facts
- Work it coversLockout and tagout isolation
- WhenBefore service, maintenance, demolition, tie-in, or energization work begins.
- RuleOHSA machine, electrical, and hazardous energy controls
- Who signsAuthorized worker and supervisor acknowledgement for each isolation and removal event.
- Keep itRetain with equipment, electrical, and maintenance records.
When must the log be completed?
- Required Timing: Before service, maintenance, demolition, tie-in, or energization work begins.
- Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
- Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.
How do you complete the log?
- Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
- Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
- Sign the Entry: Authorized worker and supervisor acknowledgement for each isolation and removal event.
- Store the Record: Retain with equipment, electrical, and maintenance records.