Ontario construction safety log

Lockout and Tagout Log

A lockout and tagout log records each energy isolation before service, maintenance or tie-in work: the equipment, energy sources, locks and tags applied, the zero-energy check and the removal. Ontario's construction regulation, O. Reg. 213/91, requires electrical equipment to be locked out and tagged before work on it, and written procedures where work is done near energized parts (section 190).

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance from the official sources listed below; the answer above was checked against Ontario's e-Laws by the publisher.

Key facts

  • Work it coversLockout and tagout isolation
  • WhenBefore service, maintenance, demolition, tie-in, or energization work begins.
  • RuleOHSA machine, electrical, and hazardous energy controls
  • Who signsAuthorized worker and supervisor acknowledgement for each isolation and removal event.
  • Keep itRetain with equipment, electrical, and maintenance records.

When must the log be completed?

  • Required Timing: Before service, maintenance, demolition, tie-in, or energization work begins.
  • Supervisor Review: Assign a competent person or supervisor to review the entry before the next shift or before the controlled work resumes.
  • Change Trigger: Re-open the log when weather, equipment, excavation, access, crew, or work-method conditions change.

How do you complete the log?

  • Identify the Controlled Work: Record the site, date, crew, equipment, area, and trade activity.
  • Check the Hazard Controls: Confirm guards, access, PPE, training, permits, isolation, or inspection evidence required for the task.
  • Sign the Entry: Authorized worker and supervisor acknowledgement for each isolation and removal event.
  • Store the Record: Retain with equipment, electrical, and maintenance records.