Ontario contractor template

Fire Watch Checklist Form Template

A fire watch checklist records the watch kept after hot work: who watched, from when to when, the conditions checked, and the final area check before leaving. A smouldering fire can start well after welding stops, which is why the watch continues after the work ends.

Published by Blue Crane Works. Last reviewed . Field list from the Blue Crane Works form library. Summary drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Fire Watch Checklist record?

Fire watch log for post hot-work monitoring, conditions, and final area check.

Fire Watch Checklist: 8 fields, 6 required
FieldRequiredAnswer type
Company NameYesShort answer
Project / Hot Work AreaYesShort answer
Fire WatchYesShort answer
Watch DateYesDate
Watch StartYesTime
Watch EndNoTime
Conditions / Equipment CheckedYesNotes
Monitoring / Close-out NotesNoNotes

Which Ontario rule applies?

Supports the fire precautions required by O. Reg. 213/91, ss. 122–124 (Welding and Cutting) where the project procedure assigns a fire watch.

Read the law

Key facts

  • Used byGeneral Contractors, Site Supervisors & Field Crews
  • Also calledfire watch log, post hot work inspection, fire watch checklist
  • Format8 fields to fill in, then sign and keep with the project file