A commercial tenant fit-out checklist tracks everything between taking possession of a unit and opening it: permits, landlord approvals, trades, inspections and handover. Fit-outs that change walls, exits, plumbing or fire separations usually need a building permit, and the barrier-free design rules in Section 3.8 of the Ontario Building Code can apply, so the list starts with the permit and the landlord's work letter.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Commercial Tenant Fit-Out Checklist & SOW record?

  • Lease work letter: landlord work versus tenant work
  • Drawings, permit application and zoning check
  • Landlord approvals and building rules for contractors
  • Trade schedule: demolition, framing, electrical, mechanical, finishes
  • Accessibility items under Building Code Section 3.8
  • Inspections, occupancy and final sign-off
  • Deficiencies and closeout documents

Which Ontario rule applies?

The Building Code Act, 1992 requires a permit before construction or renovation the Act covers, and the municipality inspects the work. The Ontario Building Code (O. Reg. 332/12) sets the technical rules, including barrier-free design in Division B, Section 3.8. Zoning is municipal: check the use is permitted before signing the lease.

Read the law

Key facts

  • Used byGeneral Contractors & Interior Fit-Out Specialists
  • FormatChecklist of 7 items to complete and keep with the project file