What does the Commercial Plumbing Scope of Work (SOW) record?
- Drainage, venting and water distribution included
- Fixtures and equipment: who supplies, who installs
- Backflow prevention and testing
- Permit, inspections and pressure tests
- Interfaces with mechanical, fire protection and civil work
- As-builts, manuals and warranty
- Exclusions and sign-off
Which Ontario rule applies?
Plumbing design and installation must meet Part 7 of the Ontario Building Code (O. Reg. 332/12), with permits and inspections under the Building Code Act, 1992. Payment for the work follows the Construction Act's prompt-payment rules.
Read the law
Key facts
- Used byPlumbing Contractors
- FormatChecklist of 7 items to complete and keep with the project file