Shop Drawing Review Log Template

A shop drawing review log tracks each fabrication drawing a subtrade or supplier submits for review, the reviewer's stamp and comments, and the date it was released for fabrication. It is the record that fabrication matched reviewed drawings, which matters when something does not fit.

Published by Blue Crane Works. Last reviewed . Drafted with AI assistance; every rule cited was checked against Ontario's e-Laws.

What does the Shop Drawing Review Log record?

  • Drawing number, revision and trade
  • Date submitted and reviewer: architect or engineer
  • Review stamp: reviewed, reviewed as noted, revise and resubmit
  • Comments and required changes
  • Date released for fabrication
  • Superseded revisions

Which Ontario rule applies?

Shop drawing review is set by the contract specification, not by statute. A reviewer's stamp usually confirms general conformance with the design intent; read the stamp's wording, because it rarely shifts responsibility for dimensions and fit away from the fabricator.

Key facts

  • Used byGeneral Contractors & Consultants
  • FormatChecklist of 6 items to complete and keep with the project file