What does the Shop Drawing Review Log record?
- Drawing number, revision and trade
- Date submitted and reviewer: architect or engineer
- Review stamp: reviewed, reviewed as noted, revise and resubmit
- Comments and required changes
- Date released for fabrication
- Superseded revisions
Which Ontario rule applies?
Shop drawing review is set by the contract specification, not by statute. A reviewer's stamp usually confirms general conformance with the design intent; read the stamp's wording, because it rarely shifts responsibility for dimensions and fit away from the fabricator.
Key facts
- Used byGeneral Contractors & Consultants
- FormatChecklist of 6 items to complete and keep with the project file